23 December 2013

Just when we thought it was safe

We had assumed that the dirty work was over. All the builder had to do was lay the new flooring in the dining room and put the new wooden treads on the staircase. Assumption incorrect. The new flooring in the lounge room had ballooned up over the last week so, when the builder arrived two days ago, his first job was to ease the pressure by cutting the flooring along all the walls. We then had a gap between the flooring and the stone walls which was certainly better than a ballooning floor but a bit "brutto" to look at and clean. The builder suggested filling this gap with soft foam then running silicone of the same colour as the flooring along the top of the foam. This solution would allow the flooring to expand into the foam and make it easy to clean the edges but would also allow us to remove the silicone if we find that there is a further ballooning problem in the future. The builder then started to put the new wooden treads on the staircase. First, he jackhammered out the stones in the surrounding wall (=more rubble) in order to lay the landing on both the wall and the staircase steel. As with all tasks here, this proved to be challenging with the landing not being entirely square and the two bedrooms that come off the landing at different levels. Yesterday he laid the new flooring in the dining room, thankfully considering process improvements discovered from recent experience!

Above: the lounge room in disarray for the builder to cut the edges. There is now a whole new layer of dust over everything!

Above: the dining room again has rubble everywhere as a result of the fitting of the landing on the staircase

Above: the landing on the staircase in the process of being fitted

 

21 December 2013

Stairway to heaven

The builder had to wait for the cement slab to dry out before he could finish laying the flooring. He also had to wait for the stair treads to be hardened (kiln-fired) before he could finish the stairs. This meant he had a week's break from trundling up our little valley. Before he left, he gave me a tin of rust inhibitor paint and suggested that I paint the staircase steel before the treads arrive. He had chosen the colour, which he announced to be "anthracite". This week I got started on this most tedious of jobs (do you know how many angles a staircase railing and bannister has!?) and have finally finished it.

Above: the staircase with the temporary treads that the builder made for us out of spare scaffolding planks

Above: the staircase from the dining room

Above: the staircase from the landing

 

20 December 2013

Rubble

Between our own demolition works and the builders', our rubble pile has expanded into quite a little mountainous eyesore. However, this is valuable stuff! It will be the base for our new circular driveway and fill for the many potholes in the driveway.

Above: the pile from the hill behind the house

Above: the pile from the lounge room door

 

19 December 2013

Communication!!!

After 3 months, we finally have a fixed phone line into the house. Last time we lived here, we had no trouble getting a connection as there was already an existing line. Getting connected this time has been a major challenge. At some point in the last 3 years, the existing line had been compromised. Stu traced the problem to 3 telegraph poles up the hill behind our house where the line had broken under the weight of fallen bamboo and trees in the forest. We had to wait for Telecom Italia to clear the forest and string a new line. The technicians who did this work also installed a lightning rod to ensure that future storms don't compromise our communication. Now we can talk on our phone...but we are still waiting for internet via ADSL to be activated...

Above: the Telecom Italia contractor who came to fix the phone line

 

Christmas!

Our building works have taken until the end if this week to complete. I have finally started decorating for Christmas...

Above: the side door with a pine bough wreath, ribbon and christmas balls

Above: the lounge room with a glass vase of christmas balls and lights

Above: the dining room with glass vases of christmas balls and lights

Above: the kitchen with a pine bough wreath, ribbon and christmas balls

Above: our crib on the ledge in the lounge room

Above: our midget Santa on his way

 

13 December 2013

Flooring...oops, another pipe!?

The more we looked at the beautiful job that the builder has done on the inside of the house, the more worried we became that we wouldn't do justice to it when we laid the flooring. The downstairs rooms have stone walls (no smooth plaster) which posed a challenge in terms of edging the flooring. The builder offered to lay the flooring for us at a reasonable cost so we have taken him up on it. And this has proved to be a good decision. First, he cut a groove all along the stone wall, into which he inserted the flooring, allowing half a centimetre for expansion in summer. This is something we definitely wouldn't have thought of or been able to do. Once the lounge room was finished, he moved on to the dining room. And that's where things got a little difficult. Most of you will know that we have been constantly challenged by our pipes. Pipes carry everything into and out of the house including water, gas, electricity, heating, sewerage. When we purchased the house in 2009 the pipes and cement slab had already been laid and no schematic was available. So we have been "discovering" our pipes ever since. This week the builder discovered another one by jackhammering through it. Suddenly, a fountain of hot steamy water flowed into the dining room. The builder gaped at me silently before thrusting his trowel into the hole to stem the flow. I yelled at Stu to turn the water off. Stu ran around the back of the house and turned everything off, including the well pump, the radiator pumps, the caldaia, etc. There followed a phone call to our long suffering plumber who came quickly to view the problem, then promptly went to lunch (well, this IS Italy after all...). He returned after lunch to fix it but the builder's day had been ruined by the wet floor which put a stop to his flooring activities. He will return this week to finish the job.

Above: the dust created in the lounge by cutting the groove along the base of the stone walls (note: the kitchen bench is reflected in the glass of the door through which this photo was taken!)

Above: the flooring cutting workshop

Above: the beginning of the floor in the lounge room

Above: the floor in the lounge room finished (background) and our plumber fixing the pipe in the dining room

 

12 December 2013

More fiddling on the roof

While we have been in Switzerland this week, the builder resumed work on the roof. When we arrived home, we found that he had finished the re-setting of tiles on the first roof completely. Over the next two days he worked on the second roof, installing the corrugated fibro sheeting, re-setting the tiles and building the wooden surround under the eaves. I have been delivering their coffee to them on the roof...

Above: installing the corrugated sheeting before re-setting the tiles

Above: cutting the corrugated sheeting

Above: the new wood surround under the eaves

 

Fiddlers on the roof

The builder moved onto the roof project a couple of weeks ago. He only stayed on it for a day before the snow arrived. There are two aspects to this project. One roof needs the tiles to be re-set as they have slipped under the weight of snow in recent winters. The other roof needs a corrugated fibro sheeting to be installed under the tiles, the tiles to be re-set and a wooden surround to be built under the eaves. The builders started on the re-setting of tiles first. They installed a steel bar just above the guttering, then tied the guttering to this bar. They also cleaned the guttering of its heavy load of dirt, moss and and leaves. This has been causing waterfalls at particular points around the house when it rains. Then they placed each tile on a z-shaped hook that spaces them properly and ensures that they will never slip again. Our roof will now behave like a northern European roof like those in countries with heavy snowfall such as Germany or Switzerland. It also looks beautifully Italian.

Above: our roof before the re-setting of tiles
Above: the hook
Above: Sandro attaching the steel bar to the roof and tying the guttering to it
Above: Sandro and Cosimo on the roof hooking tiles in 2 degree temperatures which fell to minus 1 degree before they finished for the day

Above: the steel bar, hooks and tiles in place

 

11 December 2013

Frosty spider

Yesterday we walked into our local street market to stock up on fruit, veges, cheeses and smallgoods. On the bridge across the river we found this little spiders web covered in frost...a true work of art...

 

07 December 2013

My second favourite city

We travelled back from Switzerland via Milano and Torino. Torino is my second favourite city in the world. It is historical, classy, elegant and very regal. The sun was setting as we were walking through the city and we were treated to another spectacular sunset.

 

 

My favourite city

We left the builder with keys and free run of the house this week while we took off on a long-planned and all-important trip to Zurich. In order to change registration of the car from Switzerland to Italy, we needed to have ownership papers verified by the Strassenverkehrsamt and the Italian Consulate in Zurich. We left home at 6am on a crisp and clear day that afforded us great views of the alps. We arrived in Zurich at noon (although the trip should take 4 hours, we hadn't counted on the peak hour traffic around Milano!) After parking the car in Zurich city, we checked into our hotel, grabbed our papers and headed straight over to do our business. By 3pm we were finished and free to head down memory lane. We had lived in Zurich for 3 wonderful years and the city is without doubt my favourite city in the world. It is at its most beautiful at Christmas when its streets are filled with markets, music and food. And just when we thought it couldn't get any better, we were treated to a pink sunset reflected off the old town and an evening illuminated by Christmas lights in the Bahnhofstrasse.

 

 

 

 

05 December 2013

La strada e brutta

Our little driveway has suffered some trauma of late. Between the rain, snow and all the heavy loads of equipment and materials associated with the building projects, it is a little "soupy". This is not a good sign going into winter, when moisture will not evaporate and ice threatens. So, once the building projects are finished, we will take wheelbarrow and trailer loads of our demolition rubble down the driveway to fill the "soupy" parts. This will ensure that the car can make it up any ice on the last little rise to the house and that the area around the house remains stable.

 

Resourcefulness

During the last few weeks we have been in a constant state of amazement. We are utterly flabbergasted at the capability and resourcefulness of our Italian builders. I am frequently reminded of comments from my childhood about Italians who emigrated to Australia in the 1950s. They were often tradesmen who had a reputation for being able to do anything and being fazed at nothing, for finding nothing impossible and using great resourcefulness. That is how our experience with these builders has been. Our house is accessed by a 1km one-lane gravel/dirt track that was at first sloshy from rain then iced up by snow. At the house there is a very small turnaround area and I always worry about the size of vehicles coming in and whether or not they will be able to turn without getting bogged. The builder has a small truck which manoeuvres "on a two cent coin" and also has a load tipper. He adapts to whatever he finds on his worksite. We have found him making good use of our temporary lighting, hoses, shovels, brooms, rocks, bricks, etc. Our hose, which didn't have a connector end for attachments, has suddenly got one. The branches of the huge wisteria vine that grows along the front of the house were cut or parted to enable a small lifting mechanism to be installed on the terrazza. This was used to raise wheelbarrows of cement to the first floor. For the staircase voltini job, they moved 500 bricks and rubble from the demolition in the space of 1 hour, then raised sand in countless bucketloads on ropes for the construction of the voltini. We have such massive respect for them and find ourselves constantly asking how an Australian might handle such inconvenience and heavy manual labour...

 

02 December 2013

Hanging around

My rustic kitchen gives me licence to hang things...

Above: salame

Above: peperoncino

Above: rosmarino, timo, salvia

 

Bread

My bread-maker has "given up the ghost" after many years of service. In the last week my loaves had started to shrink and solidify which I couldn't understand. I would put it on, then go outside to clean bricks so I was not aware that it was struggling. However I finally caught it doing a "stop and start" thing. The pathetic specimen below is my final loaf. Since bread making is a critical aspect of our lifestyle here, we replaced the machine immediately with one that has a larger capacity.

Above: the shortest and most solid bread I have ever made (see size compared to coffee cup)

Above: the new machine which does larger loaves