04 April 2014

Driveway

During winter we were constantly challenged by a boggy driveway at our entry gate. So this was one of our first jobs when Spring arrived. First, Stu dug out a hump on the left which made the driveway smoother. Then he installed a concrete drain across the driveway under the gate. This would divert water off the front garden and the rustico roof and away from the driveway. After backfilling the area with rubble from our demolition works, our driveway is now bog-free.

 

No comments:

Post a Comment

Thanks for taking the time to comment,
I appreciate each and every one.
All replies will be in the comment section so please check back to read them!